With our capacity of 348 CNC machines, our warehouse consistently holds over 2,000 forged wheel blanks of all sizes (0 day).
Due to limited production capacity and inventory funds, they do not keep stock and must purchase from other factories as needed. It will take 5~7 days.
The full-time Design team, from the confirmation of parameters to the completion of the design, only took 4 hours.
Without their own designers, commissioning external designers to design, communication loss, design queuing, etc., takes 3~6 days.
The full-time engineer team, from the confirmation of Design chat to the completion of the CNC machine coding , only took 6 hours.
Without their own engineer, commissioning external engineers to coding, communication loss, design queuing, etc., takes 2~3 days.
348 double-headed CNC machines are ready to be milling, and a set of wheels takes only 6 hours.
Up to 20 CNC normal machines, you need to queue during busy times, and a set of wheels only takes 2~3 days.
Customer special requirements and surface finishing are all completed in the own factory, usually within 1 day.
Finish the processing at the outsourced factory, usually takes 3~5 days.
In the own factory spray line according to the color arrangement, usually takes 2~3 days.
They sends to the outsourcing painting factory for queuing painting, usually takes 7~10 days, or even more.
watch video to check how is the our Freeman old factory. The new plant, covering 100,000 square meters, will be operational by 2025.